Project : Potabilization unit of waste water. Location : Dam Manantaly (Mali) Capacity : 100m3/h. Client : Hydranet (France). Project manager : Hydranet (France). Year of realization : 2010-2011. Services :
Study, design of the switchboard.
Programming : PLC and operating panel.
Start up on site.